Materials estimate coming

General, Tiny House Construction

April 6th, 2011: The feeling is that we are going to build, even if the budget is tight. We can always finish the inside slowly as long as we have enough money to get it weather tight, wired and plumbed. We edited the materials list from Bob, and took it to the Perkin’s lumber with drawings. They are going to give us prices and email them. They loved the prints of the plans. We are filling out the Efficiency Vermont paperwork for Energy Star rebates and assistance possibilities with Bob’s help. We are talking with possible framers about time in mid June to start framing.

Leave a Reply